-
1. The engineer used a special tool to remove the damaged column top plate.
工程师使用一种特殊的工具来移除损坏的柱顶板。
-
2. The construction crew had to replace the damaged column top plate before they could continue work.
施工队在继续工作之前必须更换损坏的柱顶板。
-
3. The engineer carefully inspected the column top plate to ensure it was properly secured.
工程师仔细检查柱顶板以确保其正确固定。