-
1.The design of the building has an angle of maximum subsidence velocity of 30 degrees.
该建筑物的设计具有最大沉降速度角为30度。
-
2. The construction of the tunnel had to take into account the angle of maximum subsidence velocity.
隧道的建设必须考虑到最大沉降速度角。
-
3. The study of this phenomenon is important for understanding the behavior of soil and rocks under different angles of maximum subsidence velocity.
研究这一现象对于理解在不同最大沉降速度角下的土壤和岩石行为非常重要。