-
1. The construction of the new bridge requiredthe use of asbestos-cement ridge capping to ensure itsdurability.
建造新桥需要使用石棉水泥封顶以确保其耐用性。
-
2. The engineercarefully inspected the asbestos-cement ridge capping before startingthe project.
工程师在开始项目之前仔细检查了石棉水泥封顶。
-
3. The asbestos-cement ridge capping was installed to prevent water infiltration and maintain structural integrity.
安装石棉水泥封顶是为了防止水分渗透并保持结构完整性。