-
1.Before the boiler was installed, a hydrostatic test was conducted to ensure its stability and safety.
在锅炉安装前,进行了水压试验以确保其稳定性和安全性。
-
2. During the hydrostatic test, the pressure gauge showed that the water level was within the acceptable range.
在水压试验期间,压力表显示水位在可接受范围内。
-
3.The hydrostatic test is an essential step in the maintenance process of the boiler system.
水压试验是锅炉系统维护过程中的关键环节。