-
1. The engineer designed a bubble tower section to improve the efficiency of the wastewatertreatment plant.
工程师设计了一个泡沫塔段,以提高污水处理厂的效率。
-
2. The construction of the new building involved the installation of a bubble tower section.
新建筑的建设涉及安装一个泡沫塔段。
-
3.The team successfully installed the bubble tower section, which significantly reduced the noise pollution in the area.
团队成功地安装了泡沫塔段,这显著减少了该地区的噪音污染。