-
1. The company conducted a climaticrisk analysis to identify potential risks in thenew project.
该公司进行了气候风险分析,以识别新项目中的潜在风险。
-
2. The climatic risk analysis revealed that the construction sitewas at high risk of flooding.
气候风险分析显示,施工现场面临洪水的高风险。
-
3. Theclimatic risk analysis helped the teamto prioritize their efforts and focuson mitigating the most significant risks.
气候风险分析帮助团队优先处理工作,并专注于减轻最重大的风险。