-
1. The engineer made the necessary crown cantilever adjustments to ensure the stability of the bridge.
工程师进行了必要的冠梁悬臂调整,以确保桥梁的稳定性。
-
2.During construction, the contractor made crown cantilever adjustments to accommodate the changes in the site conditions.
在施工过程中,承包商进行了冠梁悬臂调整,以适应现场条件的变更。
-
3. The structural engineer recommended a crown cantilever adjustment to improve theload-bearing capacity of the bridge.
结构工程师建议进行冠梁悬臂调整,以提高桥梁的承载能力。