-
1. The excavator is designed to dig at a depth of 10 meters.
挖掘机的设计深度为10米。
-
2. The engineers are measuring the digging height of the tunnel.
工程师们正在测量隧道的挖掘高度。
-
3. The construction company has been working on a project that requires a high digging height.
建筑公司一直在进行一个需要高挖掘高度的项目。