-
1.The engineer used the drop shaft sinking method to excavate the tunnel.
工程师使用沉井下沉法挖掘隧道。
-
2. The construction team adopted this method to ensure the stability of the foundation.
施工团队采用这种方法确保地基的稳定性。
-
3.The drop shaft sinking method is widely used in civil engineering projects for its efficiency and reliability.
沉井下沉法在土木工程项目中被广泛使用,因其效率和可靠性而备受青睐。