-
1. The construction crew used fascine dams to divert the floodwaters.
施工队使用帆布围堰来转移洪水。
-
2. The engineer designed a fascine dam that could withstand the heavy rainfall.
工程师设计了一个能够承受大雨的帆布围堰。
-
3.The fascine dam was a temporary solution to prevent further flooding in the area.
帆布围堰是防止该地区进一步洪水泛滥的临时解决方案。