-
1.The engineer carefully filled the pipe column with concrete to ensure its stability.
工程师小心翼翼地用混凝土填充管道柱以确保其稳定性。
-
2.The construction crew was working diligently to fill the pipe column with water and remove the debris.
施工队正努力工作,用水填充管道柱并清除碎片。
-
3.The engineer inspected the filled pipe column to ensure it met the required standards for structural integrity.
工程师检查了充满的管道柱,确保它符合结构完整性所需的标准。