-
1. The construction of the new bridgerequired the installation of fixed tube sheets.
新桥的建设需要安装固定管板。
-
2. Theengineers carefully checked the quality of thefixed tube sheets before they were used inthe project.
工程师们在项目开始前仔细检查了固定管板的质量和性能。
-
3. Thefixed tube sheets are designed to withstandhigh pressure and temperature.
固定管板设计用于承受高压和高温。