height of cut and fill at center stake

  1. 中桩填挖高度

网络词典

height of cut and fill at center stake

英 ˈhaʊt ɒf kaɪt ənd flɛɪk ət ˈskræt 美 ˈhaʊt ɒf kaɪt ənd flɛɪk ət ˈskræt
名词短语 中文翻译:中心桩上的切割和填充高度
同义词: ['center stake height', 'cutting and filling height at the center stake']

例句:

  1. 1.The engineer measured the height of the cutting and filling at the center stake before starting the construction.
    工程师在开始施工前测量了中心桩上的切割和填充高度。
  2. 2.The construction crew had to adjust their work to ensure that the height of the cutting and filling was consistent with the specifications.
    建筑工人必须调整他们的工作以确保切割和填充的高度符合规格。
  3. 3. The safety inspector checked the height of the cutting and filling at the center stake to ensure compliance with building codes.
    安全检查员检查了中心桩上的切割和填充高度,以确保遵守建筑规范。