-
1.The engineer conducted a limit drawing ratio test on the new material to ensure its strength.
工程师对新材料进行了限制绘图比例测试,以确保其强度。
-
2. During the design phase, the team used this test to optimize the product's dimensions.
在设计阶段,团队使用这个测试来优化产品的尺寸。
-
3. The test was crucial in identifying any potential issues with the manufacturing process.
测试对于识别制造过程中的潜在问题至关重要。