pile driving formula

  1. 打桩公式

网络词典

pile driving formula

英 ˈpaɪldrɪvət fɔː.mə 美 ˈpaɪldrɪvət fɔː.mə
名词短语 中文翻译:堆叠驱动公式同义词
同义词: ['pile-driving formula', 'pile-driving algorithm']

例句:

  1. 1. The piling driver is responsible for ensuring that the piles are properly driven and aligned.
    堆叠驱动机负责确保桩被正确地打桩并对准。
  2. 2. The piling driver is also responsible for monitoring the progress of the pile installation.
    堆叠驱动机还负责监控桩安装的进度。
  3. 3. The piling driver must be able to adjust the speed and direction of the drive to optimize thepile installation process.
    堆叠驱动机必须能够调整驱动的速度和方向,以优化桩安装过程。