-
1.The surveyor used a plumb datum to ensure the accuracy of the measurements.
测量员使用铅垂线基准来确保测量的准确性。
-
2. The engineer used the plumb datum to calculate the length of the tunnel.
工程师使用铅垂线基准来计算隧道的长度。
-
3.The construction team used the plumb datum to level the foundations of the building.
施工团队使用铅垂线基准来平整建筑物的基础。