-
1.The prestressed concrete drilled caisson was used to support the foundation of the new bridge.
预应力混凝土钻孔沉箱被用来支撑新桥的基础。
-
2.The construction of the prestressed concrete drilled caisson is a complex process requiring expertise in engineering.
预应力混凝土钻孔沉箱的建造是一个复杂的过程,需要工程专家的专业知识。
-
3. The prestressed concrete drilled caisson has been proven to be an effective solution for flood controlin urban areas.
预应力混凝土钻孔沉箱已被证明是城市地区防洪的有效解决方案。