-
1.The new bridge is a prestressed concrete structure, which greatly reduces traffic congestion.
这座新桥是一座预应力混凝土结构,极大地减少了交通拥堵。
-
2.The engineer designed the prestressed concrete structure to withstand high loads.
工程师设计了预应力混凝土结构来承受高负载。
-
3.The prestressed concrete structure is an essential part of the construction project, requiring careful planning and execution.
预应力混凝土结构是建设项目中不可或缺的一部分,需要仔细规划和执行。