-
1.The new system will run a scheduling subsystem to optimize resource allocation.
新系统将运行一个调度子系统以优化资源分配。
-
2. The scheduling subsystem is responsible for managing the schedule of events.
调度子系统负责管理事件安排。
-
3. The scheduling subsystem was designed to improve efficiency and reduce errors.
调度子系统被设计来提高效率并减少错误。