-
1.The engineer used a sling stay channel to reinforce the bridge.
工程师使用吊索和吊杆通道加固了桥梁。
-
2.The construction crew was working on the sling stay channel system.
施工队正在安装吊索和吊杆通道系统。
-
3.The sling stay channel was crucial in maintaining the stability of the bridge.
吊索和吊杆通道在保持桥梁稳定性方面至关重要。