-
1.The towing warp tensiometer was used to measure the tension of the cable during the installation process.
在安装过程中,使用拖曳测力计测量了缆线的张力。
-
2. The engineer used the towing warp tensiometer to ensure that the cable was securely attached to the anchor.
工程师使用拖曳测力计确保电缆牢固地连接到锚点。
-
3. The towing warp tensiometer helped the team to quickly identify any potential issues with the installation.
拖曳测力计帮助团队迅速识别出安装过程中的潜在问题。